![1](https://i1.wp.com/rockconstruction.ie/wp-content/uploads/2011/09/1.jpg?resize=800%2C612)
Prince of Wales Terrace, Ballsbridge, Dublin 4
Architect: Mac Eoin Architect
Project valuation: €250,000.00
Project Completed on time: 6 Months
Job Description: Rectifying severe subsidence, upgrading thermal standards and refurbishment
Activity of works:
- Site set up
- Demolitions
- Structural Steel Work
- Underpinning
- Concrete crack repairs
- Concrete floor slabs
- Joinery
- Mechanical
- Electrical
- Solar Panel Installation
- Heat Recovery system
- Balustrading
- Hard Tiling
- Hardwood Flooring
- Automatic Entrance Gates